Build It
Students were assigned to build a free standing structure out of scotch tape and 10 sheets of newspaper that would hold the weight of Hershey bars. The winner was the bridge that held the most Hershey bars and also had the longest span.
Winning Group:
Kendra, David, Danielle S. and Greg show their final product.
The structure that held the most weight (but wasn't the longest)
Another groups tries to figure out where to start with all that newspaper.
The group behind the structure that held the most.